  • curprev 09:4409:44, 15 April 2024YRAELCGMP talk contribsm 29,999 bytes +183 Under the section "Blackout", I changed the cause of the Heywood interconnector trip to imminent loss of synchronism in conformity with the AEMO final report "Response of Loss of Synchronism Relay" (pp 52-53). Tag: Visual edit