Washington Park Projects

Boathouse area near the lake in the north end of Washington Park

Ditch & Irrigation Improvements

Download the project information sheet(PDF, 908KB)


North Boathouse Area

Denver Parks and Recreation is creating a concept plan/design for the boathouse area in the north end of Washington Park, following the park's master plan. As part of this process, an existing conditions assessment will be conducted, along with community outreach to inform how to utilize this former play area. 

Download the project information sheet.(PDF, 938KB)

Project Updates

September 2021: Download the final concept design(PDF, 4MB)


Estimated Timeline

  • Project concept design: Winter 2020-Spring 2021
  • Design development: Spring-Fall 2021
  • Construction: Q1-Q3 2022

Outreach

Surveys

Project kickoff survey: Closed 2/7/2021 | Download results summary(PDF, 979KB)

Survey 2: Closed 4/12/2021 | Download the results summary(PDF, 244KB)

Public Meeting 2

 


If you are unable to access the content of any documents provided here, please email the project manager for assistance.